Quantcast

Rockford Sun

Sunday, November 24, 2024

Village of Winnebago Public Works Committee met August 28

Meeting 04

Village of Winnebago Public Works Committee met Aug. 28.

Here is the agenda provided by the committee:

A. Call to Order

B. Roll Call

C. Approval of Minutes

Closed Meeting

D. Public Comment

This is the time we invite the public to address the Public Works Committee with issues and concerns. We ask you to limit your comments to three minutes. Personal attacks or inappropriate language of any sort will not be tolerated. A maximum of five speakers will be heard on a first come basis with sign up at the meeting. Speakers may not address zoning matters which are pending before the Zoning Committee, Zoning Board of Appeals, or the County Board. Personnel matters or pending or threatened litigation may not be addressed in open session. An individual may speak a maximum of three times per calendar year on the same topic. This prohibition shall include the repetition of the same topic in a statement on what is purported to be a different topic. After acknowledgement by the chair, please stand and state your name. Thank you for your cooperation.

E. Legislation

(19-023) Resolution Authorizing the Award of a Bid for the Resurfacing of Charles Street (CH 34) from

Mulford Road to Perryville Road (Section 19-00000-03-GM)

Cost: $245,871.28 C.B. District: 8

(19-024) Resolution Authorizing the Award of a Bid for Lining Existing Culverts on Belvidere Road

(CH 25) Between Main Street and Swanson Road.

(Section 19-00669-00-BR)

Cost: $72,620.00 C.B. District: 7

(19-025) Resolution Authorizing the Award of a Bid for the Washing and Sealing of Three Bridges on

Beltline Road (CH 11) and Kishwaukee Road (CH 3).

(Section 19-00668-00-BR)

Cost: $32,064.05 C.B. District: 9

(19-026) Bid for Scour Remediation Work at Elevator Road Bridge over N. Kinnikinnick Creek.

Resolution Authorizing the Award of a Bid for Scour Remediation of the Elevator Road (CH 8) Bridge Over North Kinnikinnick Creek. (Section 17-00652-00-BR)

Cost: $52,086.93 C.B. District: 3

F. Other Matters

Budget Amendment

Change Order(s) for Information Only

G. Reports

 County Engineer Vanderwerff –

i. Near Term Projects

 Assistant County Engineer Molina –

i. Parker Woods Subdivision Sign

ii. Speed Study on Argyle Road

iii. ISTHA Work on Elevator Road Bridge over I-90

 PWC Chairman’s Report -

H. Adjournment

http://wincoil.us/media/266004/3rd_revised_weekly_committee_schedule_8-23-19.pdf